Odyssey > This is the AC "panelboard schedule."  This is something of a misnomer, as we are builidng our own custom panel, and three of the "panelboards" ("N," "I," and "S") are actually just three different busses in one enclosure.  (Panel "G" is a store-bought job back by the generator.)  Note that "Panel S" is fed from Panels "N" and "I," which is part of our Load Management System (see the panel wiring drawing).
Odyssey > This is the DC panelboard schedule.
This is the AC "panelboard schedule." This is something of a misnomer, as we are builidng our own custom panel, and three of the "panelboards" ("N," "I," and "S") are actually just three different busses in one enclosure. (Panel "G" is a store-bought job back by the generator.) Note that "Panel S" is fed from Panels "N" and "I," which is part of our Load Management System (see the panel wiring drawing).
Odyssey > This is the AC "panelboard schedule."  This is something of a misnomer, as we are builidng our own custom panel, and three of the "panelboards" ("N," "I," and "S") are actually just three different busses in one enclosure.  (Panel "G" is a store-bought job back by the generator.)  Note that "Panel S" is fed from Panels "N" and "I," which is part of our Load Management System (see the panel wiring drawing).
This is the AC "panelboard schedule." This is something of a misnomer, as we are builidng our own custom panel, and three of the "panelboards" ("N," "I," and "S") are actually just three different busses in one enclosure. (Panel "G" is a store-bought job back by the generator.) Note that "Panel S" is fed from Panels "N" and "I," which is part of our Load Management System (see the panel wiring drawing).
See photo in gallery

Comments

|

New comment:

Name: Email: Link:


To foil spammers, enter this code: copy this text in this box: Code unreadable?